Additive Manufacturing Service Bureau Quoting worked example
AM Order Profitability at 110% margin capture rate after discounts: a worked example
Push margin capture rate after discounts up to 110% and the picture changes. This example computes every intermediate figure at that operating point. a service bureau owner or quoting manager needs to judge whether an order is worth accepting
The inputs for this scenario
- Sellable parts or billable print hours: 65 parts or hr (unchanged)
- Contribution margin per part or print hour: 22 $ / part or $ / hr (unchanged)
- Margin capture rate after discounts: 110 % (raised for this scenario; the documented default is 100)
- Fixed setup and post-processing profit add: 380 $ (unchanged)
Working through the calculation
- Applying the documented formula (Captured contribution = sellable units × contribution per unit × profitability capture) to the inputs above produces each figure below.
- At this operating point the engine returns 1,953 $ for order profitability basis, the number this scenario is built around.
- At this operating point the engine returns 30.05 $ / part or $ / hr for contribution per unit.
- At this operating point the engine returns 1,573 $ for captured contribution.
- At this operating point the engine returns 380 $ for fixed profit adjustment.
How this compares with the baseline
- Against the tool's baseline example, where margin capture rate after discounts sits at 100% and the headline result is 1,810 $, this scenario comes in 7.9% above the baseline at 1,953 $.
- It computes the total dollar contribution an additive order generates from its sellable units, per-unit margin, the share of that margin you actually capture after concessions, plus any fixed profit add. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Order profitability basis: 1,953 $ (headline result)
- Contribution per unit: 30.05 $ / part or $ / hr
- Captured contribution: 1,573 $
- Fixed profit adjustment: 380 $
Run it with your numbers
- Every input above is editable in the live AM Order Profitability calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.