Adhesives, Sealants & Industrial Bonding worked example
Bond Failure Cost at 98% adhesive-attributable failure share: a worked example
What does the result look like when adhesive-attributable failure share reaches 98%? The full calculation is worked below with real intermediate numbers. a quality manager needs to quantify the cost of adhesive or sealant bond failures
The inputs for this scenario
- Failed bonded assemblies: 9 assemblies (unchanged)
- Cost per bond failure: 420 $ / failure (unchanged)
- Adhesive-attributable failure share: 98 % (raised for this scenario; the documented default is 85)
- Containment/investigation charge: 950 $ (unchanged)
Working through the calculation
- Applying the documented formula (Adhesive-attributable failure cost = failed assemblies × cost per failure × attributable share) to the inputs above produces each figure below.
- At this operating point the engine returns 4,654 $ failure for bond failure cost exposure, the number this scenario is built around.
- At this operating point the engine returns 517 $ / failure for cost per bond failure.
- At this operating point the engine returns 3,704 $ failure for adhesive-attributable failure cost.
- At this operating point the engine returns 950 $ for containment/investigation charge.
How this compares with the baseline
- Against the tool's baseline example, where adhesive-attributable failure share sits at 85% and the headline result is 4,163 $ failure, this scenario comes in 11.8% above the baseline at 4,654 $ failure.
- A figure at this level is achievable when adhesive-attributable failure share is genuinely sustained, not just peaked for a shift. It assigns a single attributable share to all failures, but root cause usually splits across surface prep, cure, substrate, and adhesive — so the share should come from a real failure analysis, not a guess.
Results at a glance
- Bond failure cost exposure: 4,654 $ failure (headline result)
- Cost per bond failure: 517 $ / failure
- Adhesive-attributable failure cost: 3,704 $ failure
- Containment/investigation charge: 950 $
Run it with your numbers
- Every input above is editable in the live Bond Failure Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.