Ceramic Batch Cycle Time at 276% drying, binder burnout, soak and cooling allowance: a worked example
Push drying, binder burnout, soak and cooling allowance up to 276% and the picture changes. This example computes every intermediate figure at that operating point. a production planner needs to estimate lead time for a ceramic batch moving through firing and finishing
The inputs for this scenario
- Parts or process steps in the batch: 760 parts or steps (unchanged)
- Throughput pace per minute: 3.2 units/min (unchanged)
- Drying, binder burnout, soak and cooling allowance: 276 % (raised for this scenario; the documented default is 240)
Working through the calculation
- Applying the documented formula (Base batch processing time = ceramic batch work content รท batch processing pace) to the inputs above produces each figure below.
- At this operating point the engine returns 893 batch hr for estimated ceramic batch cycle time, the number this scenario is built around.
- At this operating point the engine returns 238 batch hr for base batch processing time.
- At this operating point the engine returns 276 % for drying, soak, cooling, and queue allowance.
- At this operating point the engine returns 3.2 units/min for batch processing pace.
How this compares with the baseline
- Against the tool's baseline example, where drying, binder burnout, soak and cooling allowance sits at 240% and the headline result is 808 batch hr, this scenario comes in 10.59% above the baseline at 893 batch hr.
- It divides batch work content by processing pace to get base time, then multiplies by one plus the allowance to add drying, soak, cooling, and queue time. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Estimated ceramic batch cycle time: 893 batch hr (headline result)
- Base batch processing time: 238 batch hr
- Drying, soak, cooling, and queue allowance: 276 %
- Batch processing pace: 3.2 units/min