Aerospace & Defense Manufacturing worked example
Special Process Audit Load at 63% finding and follow-up allowance: a worked example
This scenario runs the special process audit load calculation on the strong side: 63% finding and follow-up allowance, with every other input held at its documented default. a supplier quality engineer needs to plan audit effort for Nadcap-style or customer-controlled special processes
The inputs for this scenario
- Special-process evidence records to review: 125 records (unchanged)
- Special-process audit review pace: 1.6 records/min (unchanged)
- Finding and follow-up allowance: 63 % (raised for this scenario; the documented default is 55)
Working through the calculation
- Applying the documented formula (Base special-process review time = evidence records รท audit review pace) to the inputs above produces each figure below.
- At this operating point the engine returns 127 audit hr for special process audit load, the number this scenario is built around.
- At this operating point the engine returns 78.13 audit hr for base special-process review time.
- At this operating point the engine returns 63 % for finding and follow-up allowance.
- At this operating point the engine returns 1.6 records/min for special-process audit review pace.
How this compares with the baseline
- Against the tool's baseline example, where finding and follow-up allowance sits at 55% and the headline result is 121 audit hr, this scenario comes in 5.16% above the baseline at 127 audit hr.
- Use it when scheduling internal or supplier special-process audits, planning Nadcap re-accreditation prep, or staffing an audit against a fixed window. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Special process audit load: 127 audit hr (headline result)
- Base special-process review time: 78.13 audit hr
- Finding and follow-up allowance: 63 %
- Special-process audit review pace: 1.6 records/min
Run it with your numbers
- Every input above is editable in the live Special Process Audit Load calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.