Aftermarket, Field Service & Service Parts worked example

Technician Travel Cost at 58% recoverable travel share: a worked example

This worked example runs the technician travel cost numbers for a tougher week than the baseline: 58% recoverable travel share instead of the typical 80%. Estimate technician travel cost from travel hours or trips, loaded travel rate, billable share, and fixed travel expenses.

The inputs for this scenario

  • Technician travel hours: 420 hr (held at the documented default)
  • Loaded travel labor rate: 72 $ / hr (held at the documented default)
  • Recoverable (billable) travel share: 58 % (the input this scenario stresses; the baseline uses 80)
  • Fixed travel expenses: 9,600 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Recoverable travel cost = travel hours × loaded travel cost rate × recoverable travel share.
  • Technician travel cost works out to 27,139 $ travel cost at these inputs, and this is the headline figure for the scenario.
  • Loaded travel cost rate works out to 64.62 $ / hr at these inputs.
  • Recoverable travel cost works out to 17,539 $ travel cost at these inputs.
  • Fixed travel expenses works out to 9,600 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where recoverable travel share sits at 80% and the headline result is 33,792 $ travel cost, this scenario comes in 19.69% below the baseline at 27,139 $ travel cost.
  • Use it when pricing a service contract, evaluating route-optimization savings, or analyzing the true cost-to-serve of a field-service region. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Technician travel cost: 27,139 $ travel cost (headline result)
  • Loaded travel cost rate: 64.62 $ / hr
  • Recoverable travel cost: 17,539 $ travel cost
  • Fixed travel expenses: 9,600 $