AI & Digital Manufacturing Analytics worked example

Connected Asset Percentage at 61% target connected asset share: a worked example

Suppose target connected asset share falls to 61%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Calculate connected asset percentage from assets streaming usable data, total in-scope assets, and a target connectivity percentage.

The inputs for this scenario

  • Assets streaming usable data: 86 assets (held at the documented default)
  • Total in-scope assets: 125 assets (held at the documented default)
  • Target connected asset share: 61 % (the input this scenario stresses; the baseline uses 85)

Working through the calculation

  • The calculation starts from the formula this tool documents: Connected asset percentage = assets streaming usable data ÷ total in-scope assets × 100.
  • Connected asset percentage works out to 68.8 % connected at these inputs, and this is the headline figure for the scenario.
  • Connectivity gap to target works out to -7.8 points at these inputs.
  • Assets streaming usable data works out to 86 assets at these inputs.
  • Total in-scope assets works out to 125 assets at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where target connected asset share sits at 85% and the headline result is 68.8 % connected, this scenario lands almost exactly on the baseline at 68.8 % connected.
  • It computes the percentage of in-scope assets that are streaming usable data and the point gap between that percentage and your connectivity target. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.

Results at a glance

  • Connected asset percentage: 68.8 % connected (headline result)
  • Connectivity gap to target: -7.8 points
  • Assets streaming usable data: 86 assets
  • Total in-scope assets: 125 assets

Run it with your numbers

  • To rerun this with your own numbers, open the live Connected Asset Percentage calculator, set target connected asset share to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.