AI & Digital Manufacturing Analytics worked example
Predictive Maintenance Alert Value with critical spares available for alerts of 120 parts: a worked example
Push critical spares available for alerts up to 120 parts and the picture changes. This example computes every intermediate figure at that operating point. a maintenance manager needs to check whether predicted failures can be covered with available spare parts
The inputs for this scenario
- Critical spares available for alerts: 120 parts (raised for this scenario; the documented default is 48)
- Predicted alert-driven daily usage: 6 parts/day (unchanged)
- Alert uncertainty safety factor: 1.5 x (unchanged)
Working through the calculation
- Applying the documented formula (Base alert response days = critical spares available รท predicted alert-driven daily usage) to the inputs above produces each figure below.
- At this operating point the engine returns 13.33 protected days for protected alert response days, the number this scenario is built around.
- At this operating point the engine returns 20 days for base alert response days.
- At this operating point the engine returns 120 parts for critical spares available.
- At this operating point the engine returns 6 parts/day for predicted alert-driven daily usage.
How this compares with the baseline
- Against the tool's baseline example, where critical spares available for alerts sits at 48 parts and the headline result is 5.33 protected days, this scenario comes in 150% above the baseline at 13.33 protected days.
- It computes the protected response days your on-hand critical spares provide against predicted usage, discounted by an alert-uncertainty safety factor. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Protected alert response days: 13.33 protected days (headline result)
- Base alert response days: 20 days
- Critical spares available: 120 parts
- Predicted alert-driven daily usage: 6 parts/day
Run it with your numbers
- Every input above is editable in the live Predictive Maintenance Alert Value calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.