Airport Ground Support Equipment worked example
Airport GSE Delivery Risk Score with ramp or customer impact severity of 23 score: a worked example
What does the result look like when ramp or customer impact severity reaches 23 score? The full calculation is worked below with real intermediate numbers. a station manager, procurement lead, or GSE manufacturer needs to rank delivery risks before they affect ramp readiness
The inputs for this scenario
- Ramp or customer impact severity: 23 score (raised for this scenario; the documented default is 9)
- Delivery-delay likelihood: 5 score (unchanged)
- Schedule control and detection score: 5 score (unchanged)
Working through the calculation
- Applying the documented formula (Airport GSE delivery risk score = ramp/customer impact severity × delivery-delay likelihood × schedule control and detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 12.2 risk score for airport gse delivery risk score, the number this scenario is built around.
- At this operating point the engine returns 23 score for ramp or customer impact severity.
- At this operating point the engine returns 5 score for delivery-delay likelihood.
- At this operating point the engine returns 5 score for schedule control and detection score.
How this compares with the baseline
- Against the tool's baseline example, where ramp or customer impact severity sits at 9 score and the headline result is 6.6 risk score, this scenario comes in 84.85% above the baseline at 12.2 risk score.
- A figure at this level is achievable when ramp or customer impact severity is genuinely sustained, not just peaked for a shift. Scores are subjective ratings, so they prioritize relative risk well but should not be read as an absolute probability of a late delivery.
Results at a glance
- Airport GSE delivery risk score: 12.2 risk score (headline result)
- Ramp or customer impact severity: 23 score
- Delivery-delay likelihood: 5 score
- Schedule control and detection score: 5 score
Run it with your numbers
- Every input above is editable in the live Airport GSE Delivery Risk Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.