Airport Ground Support Equipment worked example

Airport GSE Warranty Cost at 86% covered warranty claim share: a worked example

This scenario runs the airport gse warranty cost calculation on the strong side: 86% covered warranty claim share, with every other input held at its documented default. a GSE manufacturer or procurement manager needs to estimate warranty exposure for a fleet or product line

The inputs for this scenario

  • Expected GSE warranty claims: 64 claims (unchanged)
  • Average cost per warranty claim: 1,250 $ / claim (unchanged)
  • Covered warranty claim share: 86 % (raised for this scenario; the documented default is 75)
  • Fixed warranty administration cost: 22,000 $ (unchanged)

Working through the calculation

  • Applying the documented formula (Covered warranty claim cost = expected warranty claims × average cost per claim × covered claim share) to the inputs above produces each figure below.
  • At this operating point the engine returns 90,800 $ warranty cost for total gse warranty cost, the number this scenario is built around.
  • At this operating point the engine returns 1,419 $ / piece for average cost per warranty claim.
  • At this operating point the engine returns 68,800 $ for covered warranty claim cost.
  • At this operating point the engine returns 22,000 $ for fixed warranty administration cost.

How this compares with the baseline

  • Against the tool's baseline example, where covered warranty claim share sits at 75% and the headline result is 82,000 $ warranty cost, this scenario comes in 10.73% above the baseline at 90,800 $ warranty cost.
  • Use it when setting a warranty accrual, pricing warranty into a GSE unit, or tracking whether claim experience is trending against budget. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Total GSE warranty cost: 90,800 $ warranty cost (headline result)
  • Average cost per warranty claim: 1,419 $ / piece
  • Covered warranty claim cost: 68,800 $
  • Fixed warranty administration cost: 22,000 $