Airport Ground Support Equipment worked example
GSE Weldment Scrap Cost at 75% scrap exposure share: a worked example
Push scrap exposure share up to 75% and the picture changes. This example computes every intermediate figure at that operating point. a fabrication manager needs to estimate weldment scrap exposure for airport GSE structures
The inputs for this scenario
- Scrapped GSE weldments: 28 weldments (unchanged)
- Cost per GSE weldment: 1,850 $ / weldment (unchanged)
- Scrap exposure share: 75 % (raised for this scenario; the documented default is 65)
- Fixed inspection or disposal cost: 9,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable weldment scrap cost = scrapped GSE weldments × cost per weldment × scrap exposure share) to the inputs above produces each figure below.
- At this operating point the engine returns 47,850 $ scrap cost for total gse weldment scrap cost, the number this scenario is built around.
- At this operating point the engine returns 1,709 $ / piece for cost per gse weldment.
- At this operating point the engine returns 38,850 $ for variable weldment scrap cost.
- At this operating point the engine returns 9,000 $ for fixed inspection or disposal cost.
How this compares with the baseline
- Against the tool's baseline example, where scrap exposure share sits at 65% and the headline result is 42,670 $ scrap cost, this scenario comes in 12.14% above the baseline at 47,850 $ scrap cost.
- It computes total weldment scrap cost by combining variable per-weldment loss, scaled by an exposure share, with a fixed inspection or disposal cost. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total GSE weldment scrap cost: 47,850 $ scrap cost (headline result)
- Cost per GSE weldment: 1,709 $ / piece
- Variable weldment scrap cost: 38,850 $
- Fixed inspection or disposal cost: 9,000 $
Run it with your numbers
- Every input above is editable in the live GSE Weldment Scrap Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.