Aluminum Extrusion & Profile Manufacturing worked example
Aluminum Extrusion Die Trial Cost at 110% trial cost recovery share: a worked example
This scenario runs the aluminum extrusion die trial cost calculation on the strong side: 110% trial cost recovery share, with every other input held at its documented default. a die designer or estimator needs to budget trial cost before launching a custom extrusion
The inputs for this scenario
- Trial hours or billets run: 12 units (unchanged)
- Cost per trial hour or billet: 650 $ / unit (unchanged)
- Trial cost recovery share: 110 % (raised for this scenario; the documented default is 100)
- Fixed engineering and setup cost: 2,200 $ (unchanged)
Working through the calculation
- Applying the documented formula (Recovered variable trial cost = die trial hours or billets × cost per trial hour or billet × trial cost recovery share) to the inputs above produces each figure below.
- At this operating point the engine returns 10,780 $ die trial cost for total die trial cost, the number this scenario is built around.
- At this operating point the engine returns 898 $ / piece for cost per trial hour or billet.
- At this operating point the engine returns 8,580 $ for recovered variable trial cost.
- At this operating point the engine returns 2,200 $ for fixed engineering and setup cost.
How this compares with the baseline
- Against the tool's baseline example, where trial cost recovery share sits at 100% and the headline result is 10,000 $ die trial cost, this scenario comes in 7.8% above the baseline at 10,780 $ die trial cost.
- Use it when quoting a new die program or deciding whether to fund another correction trial on an existing die. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total die trial cost: 10,780 $ die trial cost (headline result)
- Cost per trial hour or billet: 898 $ / piece
- Recovered variable trial cost: 8,580 $
- Fixed engineering and setup cost: 2,200 $
Run it with your numbers
- Every input above is editable in the live Aluminum Extrusion Die Trial Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.