Ammunition Components & Ballistics Manufacturing worked example
Compliance Documentation Risk Score with documentation failure impact severity of 18 score: a worked example
Push documentation failure impact severity up to 18 score and the picture changes. This example computes every intermediate figure at that operating point. a compliance manager needs to prioritize documentation review for a lot, supplier package, or shipment
The inputs for this scenario
- Documentation failure impact severity: 18 score (raised for this scenario; the documented default is 7)
- Documentation issue occurrence likelihood: 4 score (unchanged)
- Detection or control weakness score: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (Lot-level planning risk score = documentation impact severity × occurrence likelihood × detection or control weakness score) to the inputs above produces each figure below.
- At this operating point the engine returns 9.35 risk score for lot-level planning risk score, the number this scenario is built around.
- At this operating point the engine returns 18 score for manufacturing impact severity.
- At this operating point the engine returns 4 score for expected occurrence score.
- At this operating point the engine returns 3 score for detection or control score.
How this compares with the baseline
- Against the tool's baseline example, where documentation failure impact severity sits at 7 score and the headline result is 4.95 risk score, this scenario comes in 88.89% above the baseline at 9.35 risk score.
- It multiplies documentation impact severity, occurrence likelihood, and detection or control weakness into a single prioritization score for compliance recordkeeping risk. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Lot-level planning risk score: 9.35 risk score (headline result)
- Manufacturing impact severity: 18 score
- Expected occurrence score: 4 score
- Detection or control score: 3 score
Run it with your numbers
- Every input above is editable in the live Compliance Documentation Risk Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.