AMR, AGV & Intralogistics Automation worked example

AMR Utilization Calculator at 54% target amr utilization: a worked example

Suppose target amr utilization falls to 54%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Calculate AMR fleet utilization from active mission time, available fleet time, and target utilization percentage.

The inputs for this scenario

  • Active AMR mission time: 1,320 robot hr (held at the documented default)
  • Available AMR fleet time: 1,800 robot hr (held at the documented default)
  • Target AMR utilization: 54 % (the input this scenario stresses; the baseline uses 75)

Working through the calculation

  • The calculation starts from the formula this tool documents: Actual AMR utilization = active AMR mission time ÷ available AMR fleet time × 100.
  • Actual AMR utilization works out to 73.33 % at these inputs, and this is the headline figure for the scenario.
  • Utilization gap to target works out to -19.33 points at these inputs.
  • Active AMR mission time works out to 1,320 robot hr at these inputs.
  • Available AMR fleet time works out to 1,800 robot hr at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where target amr utilization sits at 75% and the headline result is 73.33 %, this scenario lands almost exactly on the baseline at 73.33 %.
  • It computes actual AMR utilization as a percentage of available fleet time and the point gap to your target. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.

Results at a glance

  • Actual AMR utilization: 73.33 % (headline result)
  • Utilization gap to target: -19.33 points
  • Active AMR mission time: 1,320 robot hr
  • Available AMR fleet time: 1,800 robot hr

Run it with your numbers

  • To rerun this with your own numbers, open the live AMR Utilization Calculator calculator, set target amr utilization to your actual value, and adjust the remaining inputs to match your operation.