AMR, AGV & Intralogistics Automation worked example

Autonomous Forklift Payback Calculator with autonomous forklift project investment of 280,000 $: a worked example

This worked example runs the autonomous forklift payback calculator numbers for a tougher week than the baseline: autonomous forklift project investment of 280,000 $ instead of the typical 560,000 $. Estimate autonomous forklift payback from project investment, annual labor savings, and annual support cost.

The inputs for this scenario

  • Autonomous forklift project investment: 280,000 $ (the input this scenario stresses; the baseline uses 560,000)
  • Annual pallet-handling savings: 210,000 $ / yr (held at the documented default)
  • Annual fleet support and software cost: 52,000 $ / yr (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Net annual pallet-handling savings = annual pallet-handling savings - annual fleet support and software cost.
  • Autonomous forklift payback period works out to 1.77 yr at these inputs, and this is the headline figure for the scenario.
  • Net annual pallet-handling savings works out to 158,000 $ / yr at these inputs.
  • Autonomous forklift project investment works out to 280,000 $ at these inputs.
  • Five-year autonomous forklift net value works out to 510,000 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where autonomous forklift project investment sits at 560,000 $ and the headline result is 3.54 yr, this scenario comes in 50% below the baseline at 1.77 yr.
  • Use it when scoping an AMR/AGV forklift deployment for put-away, replenishment, or trailer loading and you need a fast payback figure before a detailed business case. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Autonomous forklift payback period: 1.77 yr (headline result)
  • Net annual pallet-handling savings: 158,000 $ / yr
  • Autonomous forklift project investment: 280,000 $
  • Five-year autonomous forklift net value: 510,000 $