Appliance Electronics & Control Boards worked example
Functional Test Yield Calculator at 99% target first-pass functional yield: a worked example
This scenario runs the functional test yield calculator calculation on the strong side: 99% target first-pass functional yield, with every other input held at its documented default. a quality or test engineer needs to track first-pass functional test performance on appliance electronic assemblies
The inputs for this scenario
- Boards passed functional test: 4,720 boards (unchanged)
- Total appliance boards tested: 5,000 boards (unchanged)
- Target first-pass functional yield: 99 % (raised for this scenario; the documented default is 97)
Working through the calculation
- Applying the documented formula (First-pass functional test yield = boards passed functional test ÷ total appliance boards tested × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 94.4 % for first-pass functional test yield, the number this scenario is built around.
- At this operating point the engine returns 4.6 points for yield gap to target.
- At this operating point the engine returns 4,720 boards for boards passed functional test.
- At this operating point the engine returns 5,000 boards for total appliance boards tested.
How this compares with the baseline
- Against the tool's baseline example, where target first-pass functional yield sits at 97% and the headline result is 94.4 %, this scenario lands almost exactly on the baseline at 94.4 %.
- Use it at end of shift or end of lot to gauge functional test performance on a control board line and flag when you are drifting under your committed yield. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- First-pass functional test yield: 94.4 % (headline result)
- Yield gap to target: 4.6 points
- Boards passed functional test: 4,720 boards
- Total appliance boards tested: 5,000 boards
Run it with your numbers
- Every input above is editable in the live Functional Test Yield Calculator calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.