Appliance Electronics & Control Boards worked example

Control Board Rework Cost Calculator at 72% rework cost captured in estimate: a worked example

This worked example runs the control board rework cost calculator numbers for a tougher week than the baseline: 72% rework cost captured in estimate instead of the typical 100%. Estimate rework cost for appliance control boards from reworked boards, labor and parts cost per board, rework capture rate, and fixed debug cost.

The inputs for this scenario

  • Control boards requiring rework: 420 boards (held at the documented default)
  • Labor and parts cost per reworked board: 18.5 $ / board (held at the documented default)
  • Rework cost captured in estimate: 72 % (the input this scenario stresses; the baseline uses 100)
  • Fixed debug or engineering support cost: 900 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Variable rework cost = control boards requiring rework × labor and parts cost per reworked board × rework cost captured in estimate.
  • Total control board rework cost works out to 6,494 $ at these inputs, and this is the headline figure for the scenario.
  • Cost per reworked board works out to 15.46 $ / board at these inputs.
  • Variable rework cost works out to 5,594 $ at these inputs.
  • Fixed debug or engineering support cost works out to 900 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where rework cost captured in estimate sits at 100% and the headline result is 8,670 $, this scenario comes in 25.09% below the baseline at 6,494 $.
  • Use it when sizing the cost of a defect excursion, comparing rework versus scrap, or budgeting engineering support for a recurring failure mode. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Total control board rework cost: 6,494 $ (headline result)
  • Cost per reworked board: 15.46 $ / board
  • Variable rework cost: 5,594 $
  • Fixed debug or engineering support cost: 900 $

Run it with your numbers

  • To rerun this with your own numbers, open the live Control Board Rework Cost Calculator calculator, set rework cost captured in estimate to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.