Appliance Electronics & Control Boards worked example
Appliance Control Board Scrap Cost Calculator at 110% scrap cost captured in estimate: a worked example
Push scrap cost captured in estimate up to 110% and the picture changes. This example computes every intermediate figure at that operating point. a quality or finance team needs to estimate control board scrap cost for a lot, shift, or warranty disposition period
The inputs for this scenario
- Control boards scrapped: 135 boards (unchanged)
- Cost per scrapped board: 22.4 $ / board (unchanged)
- Scrap cost captured in estimate: 110 % (raised for this scenario; the documented default is 100)
- Fixed disposition or failure analysis cost: 500 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable scrap cost = control boards scrapped × cost per scrapped board × scrap cost captured in estimate) to the inputs above produces each figure below.
- At this operating point the engine returns 3,826 $ for total control board scrap cost, the number this scenario is built around.
- At this operating point the engine returns 28.34 $ / board for cost per scrapped board.
- At this operating point the engine returns 3,326 $ for variable scrap cost.
- At this operating point the engine returns 500 $ for fixed disposition or failure analysis cost.
How this compares with the baseline
- Against the tool's baseline example, where scrap cost captured in estimate sits at 100% and the headline result is 3,524 $, this scenario comes in 8.58% above the baseline at 3,826 $.
- It computes total control board scrap cost from boards scrapped, the loaded cost per board, the share of cost captured, plus fixed disposition or failure-analysis cost. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total control board scrap cost: 3,826 $ (headline result)
- Cost per scrapped board: 28.34 $ / board
- Variable scrap cost: 3,326 $
- Fixed disposition or failure analysis cost: 500 $
Run it with your numbers
- Every input above is editable in the live Appliance Control Board Scrap Cost Calculator calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.