Appliance Electronics & Control Boards worked example

Control Board Supplier Risk Score Calculator with supply impact severity of 20 score: a worked example

Push supply impact severity up to 20 score and the picture changes. This example computes every intermediate figure at that operating point. a procurement, quality, or program team needs to prioritize supplier risk mitigation for control board production

The inputs for this scenario

  • Supply impact severity: 20 score (raised for this scenario; the documented default is 8)
  • Supplier issue occurrence: 5 score (unchanged)
  • Detection or mitigation weakness: 4 score (unchanged)

Working through the calculation

  • Applying the documented formula (Control board supplier risk score = supply impact severity × supplier issue occurrence × detection or mitigation weakness) to the inputs above produces each figure below.
  • At this operating point the engine returns 10.75 score for control board supplier risk score, the number this scenario is built around.
  • At this operating point the engine returns 20 score for supply impact severity.
  • At this operating point the engine returns 5 score for supplier issue occurrence.
  • At this operating point the engine returns 4 score for detection or mitigation weakness.

How this compares with the baseline

  • Against the tool's baseline example, where supply impact severity sits at 8 score and the headline result is 5.95 score, this scenario comes in 80.67% above the baseline at 10.75 score.
  • It multiplies supply impact severity, supplier issue occurrence, and detection-or-mitigation weakness into a single supplier risk score on your chosen scale. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Control board supplier risk score: 10.75 score (headline result)
  • Supply impact severity: 20 score
  • Supplier issue occurrence: 5 score
  • Detection or mitigation weakness: 4 score

Run it with your numbers

  • Every input above is editable in the live Control Board Supplier Risk Score Calculator calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.