Appliances, HVAC & White Goods Manufacturing worked example

Coil Manufacturing Cost Calculator at 72% coil cost scope included: a worked example

This worked example runs the coil manufacturing cost calculator numbers for a tougher week than the baseline: 72% coil cost scope included instead of the typical 100%. Estimate evaporator or condenser coil manufacturing cost from coil quantity, cost per coil, cost scope, and fixed setup cost.

The inputs for this scenario

  • Coil assemblies produced: 3,200 coils (held at the documented default)
  • Tube, fin, and labor cost: 28.5 $ / coil (held at the documented default)
  • Coil cost scope included: 72 % (the input this scenario stresses; the baseline uses 100)
  • Fixed coil setup or tooling cost: 6,400 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Variable coil manufacturing cost = coil assemblies produced × tube, fin, and labor cost × coil cost scope included.
  • Total coil manufacturing cost works out to 72,064 $ at these inputs, and this is the headline figure for the scenario.
  • Manufacturing cost per coil works out to 22.52 $ / coil at these inputs.
  • Variable coil manufacturing cost works out to 65,664 $ at these inputs.
  • Fixed coil setup or tooling cost works out to 6,400 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where coil cost scope included sits at 100% and the headline result is 97,600 $, this scenario comes in 26.16% below the baseline at 72,064 $.
  • Use it when pricing a coil run, evaluating whether a tooling investment pays back over expected volume, or comparing short versus long batch economics. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Total coil manufacturing cost: 72,064 $ (headline result)
  • Manufacturing cost per coil: 22.52 $ / coil
  • Variable coil manufacturing cost: 65,664 $
  • Fixed coil setup or tooling cost: 6,400 $