Appliances, HVAC & White Goods Manufacturing worked example
Compressor Test Yield Calculator at 99% target compressor test yield: a worked example
What does the result look like when target compressor test yield reaches 99%? The full calculation is worked below with real intermediate numbers. a compressor test or quality engineer needs to track first-pass compressor test performance
The inputs for this scenario
- Compressors passed test: 2,860 compressors (unchanged)
- Total compressors tested: 3,000 compressors (unchanged)
- Target compressor test yield: 99 % (raised for this scenario; the documented default is 97)
Working through the calculation
- Applying the documented formula (Compressor test yield = compressors passed test ÷ total compressors tested × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 95.33 % for compressor test yield, the number this scenario is built around.
- At this operating point the engine returns 3.67 points for compressor yield gap to target.
- At this operating point the engine returns 2,860 compressors for compressors passed test.
- At this operating point the engine returns 3,000 compressors for total compressors tested.
How this compares with the baseline
- Against the tool's baseline example, where target compressor test yield sits at 97% and the headline result is 95.33 %, this scenario lands almost exactly on the baseline at 95.33 %.
- A figure at this level is achievable when target compressor test yield is genuinely sustained, not just peaked for a shift. As a single pass/fail ratio it tells you the rate but not the failure mode, so a stable yield can still hide a shifting mix of leak, performance, and electrical rejects.
Results at a glance
- Compressor test yield: 95.33 % (headline result)
- Compressor yield gap to target: 3.67 points
- Compressors passed test: 2,860 compressors
- Total compressors tested: 3,000 compressors
Run it with your numbers
- Every input above is editable in the live Compressor Test Yield Calculator calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.