Asphalt, Road Materials & Paving Products worked example
Drum Dryer Asphalt Capacity at 99% dryer operating uptime: a worked example
Push dryer operating uptime up to 99% and the picture changes. This example computes every intermediate figure at that operating point. a plant needs to know whether drum drying capacity can support the requested tons per shift or paving window
The inputs for this scenario
- Aggregate tons dried per cycle: 18 tons / cycle (unchanged)
- Available dryer cycles in the period: 90 cycles (unchanged)
- Dryer operating uptime: 99 % (raised for this scenario; the documented default is 88)
- Dry aggregate yield (moisture-passing): 96 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross dryer capacity = aggregate tons dried per cycle × available dryer cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 1,540 tons for usable drum dryer capacity, the number this scenario is built around.
- At this operating point the engine returns 1,620 tons for gross dryer capacity.
- At this operating point the engine returns 16.2 tons for tons lost to dryer downtime.
- At this operating point the engine returns 64.15 tons for tons lost to moisture/rejects.
How this compares with the baseline
- Against the tool's baseline example, where dryer operating uptime sits at 88% and the headline result is 1,369 tons, this scenario comes in 12.5% above the baseline at 1,540 tons.
- It computes usable drum dryer capacity by taking tons dried per cycle across available cycles, then derating for dryer uptime and moisture-passing yield, and it shows the tons lost to each. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Usable drum dryer capacity: 1,540 tons (headline result)
- Gross dryer capacity: 1,620 tons
- Tons lost to dryer downtime: 16.2 tons
- Tons lost to moisture/rejects: 64.15 tons
Run it with your numbers
- Every input above is editable in the live Drum Dryer Asphalt Capacity calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.