Asphalt, Road Materials & Paving Products worked example
Asphalt Quality Sample Frequency at 99% sampling crew availability: a worked example
Push sampling crew availability up to 99% and the picture changes. This example computes every intermediate figure at that operating point. a QC technician needs to staff mix sampling, cores, gradation checks, binder tests, or density verification for a paving job
The inputs for this scenario
- QC samples required per sublot: 2 units / cycle (unchanged)
- Sublots or paving runs scheduled: 20 cycles (unchanged)
- Sampling crew availability: 99 % (raised for this scenario; the documented default is 95)
- Specification sampling validity rate: 100 % (unchanged)
Working through the calculation
- Applying the documented formula (Planned asphalt QC samples = required samples per sublot × sublots or runs scheduled) to the inputs above produces each figure below.
- At this operating point the engine returns 39.6 samples for usable asphalt qc sample capacity, the number this scenario is built around.
- At this operating point the engine returns 40 samples for planned asphalt qc samples.
- At this operating point the engine returns 0.4 samples for samples lost to crew/access limits.
- At this operating point the engine returns 0 samples for samples lost to invalid or missed checks.
How this compares with the baseline
- Against the tool's baseline example, where sampling crew availability sits at 95% and the headline result is 38 samples, this scenario comes in 4.21% above the baseline at 39.6 samples.
- It computes usable asphalt QC sample capacity by multiplying planned samples (per-sublot frequency x scheduled sublots) by crew availability and the rate of valid, spec-compliant checks. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Usable asphalt QC sample capacity: 39.6 samples (headline result)
- Planned asphalt QC samples: 40 samples
- Samples lost to crew/access limits: 0.4 samples
- Samples lost to invalid or missed checks: 0 samples
Run it with your numbers
- Every input above is editable in the live Asphalt Quality Sample Frequency calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.