Asphalt, Road Materials & Paving Products worked example

Asphalt Waste and Rework Cost at 72% unrecoverable cost share: a worked example

This worked example runs the asphalt waste and rework cost numbers for a tougher week than the baseline: 72% unrecoverable cost share instead of the typical 100%. Estimate cost of rejected mix, returned loads, failed density repair, or paving rework from affected tons and cost rate.

The inputs for this scenario

  • Rejected or reworked tonnage: 85 units (held at the documented default)
  • Rework cost per ton: 115 $ / unit (held at the documented default)
  • Unrecoverable cost share: 72 % (the input this scenario stresses; the baseline uses 100)
  • Fixed repair and disposal cost: 2,500 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Variable waste/rework cost = rejected or reworked quantity × rework cost rate × unrecoverable cost share.
  • Total asphalt waste/rework cost works out to 9,538 $ at these inputs, and this is the headline figure for the scenario.
  • Cost per affected unit works out to 112 $ / unit at these inputs.
  • Variable waste/rework cost works out to 7,038 $ at these inputs.
  • Fixed repair/disposal cost works out to 2,500 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where unrecoverable cost share sits at 100% and the headline result is 12,275 $, this scenario comes in 22.3% below the baseline at 9,538 $.
  • Use it after a failed core or density result, when pricing the risk of a marginal mix, or when comparing the cost of rework to the cost of tighter plant control. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Total asphalt waste/rework cost: 9,538 $ (headline result)
  • Cost per affected unit: 112 $ / unit
  • Variable waste/rework cost: 7,038 $
  • Fixed repair/disposal cost: 2,500 $