Battery Recycling & Materials Recovery worked example
Black Mass Recovery Yield at 23% target black mass yield: a worked example
This worked example runs the black mass recovery yield numbers for a tougher week than the baseline: 23% target black mass yield instead of the typical 32%. Calculate black mass yield from recovered black mass weight, incoming battery feed mass, and the target recovery yield for a recycling run.
The inputs for this scenario
- Recovered black mass weight: 2,850 kg (held at the documented default)
- Incoming battery feed mass: 9,000 kg (held at the documented default)
- Target black mass yield: 23 % (the input this scenario stresses; the baseline uses 32)
Working through the calculation
- The calculation starts from the formula this tool documents: Black mass recovery yield = recovered black mass weight รท incoming battery feed mass.
- Black mass recovery yield works out to 31.67 % black mass yield at these inputs, and this is the headline figure for the scenario.
- Yield gap to target works out to -8.67 points at these inputs.
- Recovered black mass works out to 2,850 kg at these inputs.
- Incoming battery feed works out to 9,000 kg at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where target black mass yield sits at 32% and the headline result is 31.67 % black mass yield, this scenario lands almost exactly on the baseline at 31.67 % black mass yield.
- Use it per batch, shift, or feedstock type when monitoring shredding and separation performance or qualifying a new feed stream. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Black mass recovery yield: 31.67 % black mass yield (headline result)
- Yield gap to target: -8.67 points
- Recovered black mass: 2,850 kg
- Incoming battery feed: 9,000 kg
Run it with your numbers
- To rerun this with your own numbers, open the live Black Mass Recovery Yield calculator, set target black mass yield to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.