Bearings, Gears & Power Transmission worked example
Gear Ratio Variant Build Capacity at 97% changeover-adjusted uptime: a worked example
This scenario runs the gear ratio variant build capacity calculation on the strong side: 97% changeover-adjusted uptime, with every other input held at its documented default. a gearbox OEM needs to confirm whether the line can build the required mix of reducer ratios, gearsets, or drive variants
The inputs for this scenario
- Ratio builds per cycle: 6 builds/cycle (unchanged)
- Available ratio build cycles: 96 cycles (unchanged)
- Changeover-adjusted uptime: 97 % (raised for this scenario; the documented default is 84)
- First-pass ratio configuration yield: 95 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross ratio builds scheduled = ratio builds per cycle × available ratio build cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 531 builds for accepted gear ratio build capacity, the number this scenario is built around.
- At this operating point the engine returns 576 builds for gross ratio builds scheduled.
- At this operating point the engine returns 17.28 builds for builds lost to changeover downtime.
- At this operating point the engine returns 27.94 builds for builds requiring configuration rework.
How this compares with the baseline
- Against the tool's baseline example, where changeover-adjusted uptime sits at 84% and the headline result is 460 builds, this scenario comes in 15.48% above the baseline at 531 builds.
- Use it when committing build quantities for a high-mix gear-ratio run where frequent changeovers and configuration failures eat into the schedule. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Accepted gear ratio build capacity: 531 builds (headline result)
- Gross ratio builds scheduled: 576 builds
- Builds lost to changeover downtime: 17.28 builds
- Builds requiring configuration rework: 27.94 builds
Run it with your numbers
- Every input above is editable in the live Gear Ratio Variant Build Capacity calculator, which recalculates instantly and can be shared with the inputs intact.