Bearings, Gears & Power Transmission worked example

Precision Grinding Cost at 58% parts requiring precision grinding: a worked example

This worked example runs the precision grinding cost numbers for a tougher week than the baseline: 58% parts requiring precision grinding instead of the typical 80%. Estimate precision grinding cost for bearing races, shafts, gears, or bushings from grind quantity, cost rate, covered share, and fixed setup adders.

The inputs for this scenario

  • Components in grinding scope: 950 parts (held at the documented default)
  • Precision grinding cost per part: 7.25 $ / part (held at the documented default)
  • Parts requiring precision grinding: 58 % (the input this scenario stresses; the baseline uses 80)
  • Fixed grinding setup and inspection cost: 1,100 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Variable precision grinding cost = grinding scope components × grinding cost per part × parts requiring precision grinding share.
  • Total precision grinding cost works out to 5,095 $ at these inputs, and this is the headline figure for the scenario.
  • Grinding cost per part works out to 5.36 $ / part at these inputs.
  • Variable precision grinding cost works out to 3,995 $ at these inputs.
  • Fixed grinding setup and inspection cost works out to 1,100 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where parts requiring precision grinding sits at 80% and the headline result is 6,610 $, this scenario comes in 22.92% below the baseline at 5,095 $.
  • Use it when quoting a bearing or gear lot, comparing grind suppliers, or evaluating whether a finish operation can be relaxed. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Total precision grinding cost: 5,095 $ (headline result)
  • Grinding cost per part: 5.36 $ / part
  • Variable precision grinding cost: 3,995 $
  • Fixed grinding setup and inspection cost: 1,100 $