Blow Molding & Hollow Plastic Products worked example
Cavitation Output at 99% cavitation efficiency: a worked example
What does the result look like when cavitation efficiency reaches 99%? The full calculation is worked below with real intermediate numbers. a production team needs to measure actual output from a multi-cavity bottle, container, or preform mold
The inputs for this scenario
- Good containers produced: 28,800 containers (unchanged)
- Measured mold runtime: 8 hr (unchanged)
- Cavitation efficiency: 99 % (raised for this scenario; the documented default is 92)
Working through the calculation
- Applying the documented formula (Raw mold output = good containers produced รท measured mold runtime) to the inputs above produces each figure below.
- At this operating point the engine returns 3,564 containers / hr for effective cavitation output, the number this scenario is built around.
- At this operating point the engine returns 3,600 containers / hr for raw mold output.
- At this operating point the engine returns 99 % for cavitation efficiency.
- At this operating point the engine returns 8 hr for measured mold runtime.
How this compares with the baseline
- Against the tool's baseline example, where cavitation efficiency sits at 92% and the headline result is 3,312 containers / hr, this scenario comes in 7.61% above the baseline at 3,564 containers / hr.
- A figure at this level is achievable when cavitation efficiency is genuinely sustained, not just peaked for a shift. Efficiency here is a single blended percentage; it tells you the line is losing output but not whether the cause is a dead cavity, slow cycle, or rejects, so it flags the problem without diagnosing it.
Results at a glance
- Effective cavitation output: 3,564 containers / hr (headline result)
- Raw mold output: 3,600 containers / hr
- Cavitation efficiency: 99 %
- Measured mold runtime: 8 hr
Run it with your numbers
- Every input above is editable in the live Cavitation Output calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.