Blow Molding & Hollow Plastic Products worked example
Neck Finish Tolerance Margin with allowable neck finish tolerance of 0.5 mm or in: a worked example
This scenario runs the neck finish tolerance margin calculation on the strong side: allowable neck finish tolerance of 0.5 mm or in, with every other input held at its documented default. a quality or process engineer needs to check neck finish margin before releasing bottles or adjusting setup
The inputs for this scenario
- Allowable neck finish tolerance: 0.5 mm or in (raised for this scenario; the documented default is 0.2)
- Measured neck finish deviation: 0.13 mm or in (unchanged)
- Reference neck tolerance: 0.2 mm or in (unchanged)
Working through the calculation
- Applying the documented formula (Remaining neck finish tolerance = allowable neck finish tolerance - measured neck finish deviation) to the inputs above produces each figure below.
- At this operating point the engine returns 185 % tolerance margin for neck finish tolerance margin, the number this scenario is built around.
- At this operating point the engine returns 0.37 mm or in for remaining neck finish tolerance.
- At this operating point the engine returns 0.5 mm or in for allowable neck finish tolerance.
- At this operating point the engine returns 0.13 mm or in for measured neck finish deviation.
How this compares with the baseline
- Against the tool's baseline example, where allowable neck finish tolerance sits at 0.2 mm or in and the headline result is 35 % tolerance margin, this scenario comes in 429% above the baseline at 185 % tolerance margin.
- Use it during process qualification and routine SPC checks to judge how much dimensional buffer the neck finish still has. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Neck finish tolerance margin: 185 % tolerance margin (headline result)
- Remaining neck finish tolerance: 0.37 mm or in
- Allowable neck finish tolerance: 0.5 mm or in
- Measured neck finish deviation: 0.13 mm or in
Run it with your numbers
- Every input above is editable in the live Neck Finish Tolerance Margin calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.