Building Materials Manufacturing worked example
Ceramic Scrap Rework at 92% target rework capacity utilization: a worked example
This scenario runs the ceramic scrap rework calculation on the strong side: 92% target rework capacity utilization, with every other input held at its documented default. a ceramic plant needs to know whether scrap recovery capacity can handle current defects and holds
The inputs for this scenario
- Rework hours or pieces used for ceramic scrap recovery: 18 hr or pieces (unchanged)
- Available rework capacity for the period: 24 hr or pieces (unchanged)
- Target rework capacity utilization: 92 % (raised for this scenario; the documented default is 80)
Working through the calculation
- Applying the documented formula (Ceramic Scrap Rework = used capacity ÷ available capacity × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 75 % rework utilization for ceramic scrap rework, the number this scenario is built around.
- At this operating point the engine returns 17 points for ceramic scrap rework gap to target.
- At this operating point the engine returns 18 value for rework hours or pieces used for ceramic scrap recovery.
- At this operating point the engine returns 24 value for available rework capacity for the period.
How this compares with the baseline
- Against the tool's baseline example, where target rework capacity utilization sits at 80% and the headline result is 75 % rework utilization, this scenario lands almost exactly on the baseline at 75 % rework utilization.
- Use it during shift or weekly capacity reviews to see whether rework effort is balanced against first-run production and your recovery target. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Ceramic Scrap Rework: 75 % rework utilization (headline result)
- Ceramic Scrap Rework gap to target: 17 points
- Rework hours or pieces used for ceramic scrap recovery: 18 value
- Available rework capacity for the period: 24 value
Run it with your numbers
- Every input above is editable in the live Ceramic Scrap Rework calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.