Building Materials Manufacturing worked example
Raw Material Batch Cost at 110% cost share assigned to this product or order: a worked example
What does the result look like when cost share assigned to this product or order reaches 110%? The full calculation is worked below with real intermediate numbers. a plant needs to cost raw batch ingredients for one product, order, or production campaign
The inputs for this scenario
- Raw material required for the batch: 1,200 tons (unchanged)
- Delivered raw material cost: 42 $ / ton (unchanged)
- Cost share assigned to this product or order: 110 % (raised for this scenario; the documented default is 100)
- Fixed receiving, screening, storage, or setup cost: 650 $ (unchanged)
Working through the calculation
- Applying the documented formula (Allocated raw material batch cost = raw material required for the batch × delivered raw material cost × allocation share) to the inputs above produces each figure below.
- At this operating point the engine returns 56,090 $ raw material cost for raw material batch cost, the number this scenario is built around.
- At this operating point the engine returns 46.74 $ / piece for delivered raw material cost.
- At this operating point the engine returns 55,440 $ for allocated raw material batch cost.
- At this operating point the engine returns 650 $ for fixed receiving, screening, storage, or setup cost.
How this compares with the baseline
- Against the tool's baseline example, where cost share assigned to this product or order sits at 100% and the headline result is 51,050 $ raw material cost, this scenario comes in 9.87% above the baseline at 56,090 $ raw material cost.
- A figure at this level is achievable when cost share assigned to this product or order is genuinely sustained, not just peaked for a shift. It assumes a single blended delivered price per ton; if a batch draws from multiple raw streams at different prices, run it once per stream and sum the results.
Results at a glance
- Raw Material Batch Cost: 56,090 $ raw material cost (headline result)
- Delivered raw material cost: 46.74 $ / piece
- Allocated raw material batch cost: 55,440 $
- Fixed receiving, screening, storage, or setup cost: 650 $
Run it with your numbers
- Every input above is editable in the live Raw Material Batch Cost calculator, which recalculates instantly and can be shared with the inputs intact.