Bulk Solids, Mining, Aggregates & Material Processing worked example
Conveyor Capacity at 99% conveyor running-time uptime: a worked example in bulk solids, mining, aggregates & material processing
This scenario runs the conveyor capacity calculation on the strong side: 99% conveyor running-time uptime, with every other input held at its documented default. a plant team is reviewing conveyor capacity for bulk solids, mining, aggregates, and material processing and needs a clear conveyor capacity for production, quality, capacity, maintenance, purchasing, or costing decisions
The inputs for this scenario
- Tonnage moved per belt cycle: 18 tons / cycle (unchanged)
- Belt cycles available in the run: 240 cycles (unchanged)
- Conveyor running-time uptime: 99 % (raised for this scenario; the documented default is 90)
- On-spec material yield: 96 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross conveyor capacity = conveyor capacity output per cycle × available conveyor capacity cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 4,106 tons for conveyor capacity, the number this scenario is built around.
- At this operating point the engine returns 4,320 tons for gross conveyor capacity.
- At this operating point the engine returns 43.2 tons for conveyor capacity uptime loss.
- At this operating point the engine returns 171 tons for conveyor capacity yield loss.
How this compares with the baseline
- Against the tool's baseline example, where conveyor running-time uptime sits at 90% and the headline result is 3,732 tons, this scenario comes in 10% above the baseline at 4,106 tons.
- Use it when planning a shift's tonnage target, validating a conveyor against its nameplate rating, or quoting a haulage contract where you must commit to delivered tons. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Conveyor Capacity: 4,106 tons (headline result)
- Gross conveyor capacity: 4,320 tons
- Conveyor Capacity uptime loss: 43.2 tons
- Conveyor Capacity yield loss: 171 tons
Run it with your numbers
- Every input above is editable in the live Conveyor Capacity calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.