Carbon Capture & CO₂ Compression Equipment worked example

Solvent Makeup Cost at 92% capture train cost share: a worked example

What does the result look like when capture train cost share reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when solvent makeup cost in carbon capture and co₂ compression equipment is being put through a carbon capture and co₂ compression equipment weighted-cost review.

The inputs for this scenario

  • Solvent makeup required: 100 gal (unchanged)
  • Delivered solvent price: 45 $ / gal (unchanged)
  • Capture train cost share: 92 % (raised for this scenario; the documented default is 80)
  • Fixed solvent handling cost: 250 $ (unchanged)

Working through the calculation

  • Applying the documented formula (Variable solvent makeup cost = solvent makeup required × delivered solvent price × capture train cost share) to the inputs above produces each figure below.
  • At this operating point the engine returns 4,390 $ for total solvent makeup cost, the number this scenario is built around.
  • At this operating point the engine returns 43.9 $ / piece for solvent makeup cost per gallon.
  • At this operating point the engine returns 4,140 $ for variable solvent makeup cost.
  • At this operating point the engine returns 250 $ for fixed solvent handling cost.

How this compares with the baseline

  • Against the tool's baseline example, where capture train cost share sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
  • A figure at this level is achievable when capture train cost share is genuinely sustained, not just peaked for a shift. The cost share is a flat allocation factor; it cannot capture transient losses from foaming, upsets or a reclaimer campaign that hit one train disproportionately.

Results at a glance

  • Total solvent makeup cost: 4,390 $ (headline result)
  • Solvent makeup cost per gallon: 43.9 $ / piece
  • Variable solvent makeup cost: 4,140 $
  • Fixed solvent handling cost: 250 $

Run it with your numbers

  • Every input above is editable in the live Solvent Makeup Cost calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.