Cathode Active Material & Precursor Manufacturing worked example
Drying Capacity at 65% expected dryer uptime: a worked example
This worked example runs the drying capacity numbers for a tougher week than the baseline: 65% expected dryer uptime instead of the typical 90%. Estimate accepted precursor or CAM drying capacity after dryer cycles, uptime, and moisture-spec yield are considered.
The inputs for this scenario
- Dry powder output per dryer cycle: 4 kg / cycle (held at the documented default)
- Planned dryer cycles: 480 cycles (held at the documented default)
- Expected dryer uptime: 65 % (the input this scenario stresses; the baseline uses 90)
- Moisture-spec first-pass yield: 97 % (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Gross dryer output = dry powder output per dryer cycle × planned dryer cycles.
- Accepted dry powder capacity works out to 1,211 kg at these inputs, and this is the headline figure for the scenario.
- Gross dryer output works out to 1,920 kg at these inputs.
- Drying capacity lost to downtime works out to 672 kg at these inputs.
- Dry powder held for moisture rework works out to 37.44 kg at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where expected dryer uptime sits at 90% and the headline result is 1,676 kg, this scenario comes in 27.78% below the baseline at 1,211 kg.
- Use it for dryer capacity planning, fleet sizing, or quantifying losses to downtime and moisture rework. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Accepted dry powder capacity: 1,211 kg (headline result)
- Gross dryer output: 1,920 kg
- Drying capacity lost to downtime: 672 kg
- Dry powder held for moisture rework: 37.44 kg
Run it with your numbers
- To rerun this with your own numbers, open the live Drying Capacity calculator, set expected dryer uptime to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.