Cell Therapy & Gene Therapy Equipment worked example

Cell Therapy Supplier Risk Score with supplier issue impact severity of 23 score: a worked example

This scenario runs the cell therapy supplier risk score calculation on the strong side: supplier issue impact severity of 23 score, with every other input held at its documented default. a procurement or supplier quality team is ranking which critical supplier needs mitigation, dual sourcing, or extra qualification

The inputs for this scenario

  • Supplier issue impact severity: 23 score (raised for this scenario; the documented default is 9)
  • Supplier issue occurrence likelihood: 5 score (unchanged)
  • Incoming control detectability: 6 score (unchanged)

Working through the calculation

  • Applying the documented formula (Supplier risk score = impact severity × 0.40 + occurrence likelihood × 0.35 + incoming control detectability × 0.25) to the inputs above produces each figure below.
  • At this operating point the engine returns 12.45 score for supplier risk score, the number this scenario is built around.
  • At this operating point the engine returns 23 score for supplier issue impact severity.
  • At this operating point the engine returns 5 score for supplier issue occurrence likelihood.
  • At this operating point the engine returns 6 score for incoming control detectability.

How this compares with the baseline

  • Against the tool's baseline example, where supplier issue impact severity sits at 9 score and the headline result is 6.85 score, this scenario comes in 81.75% above the baseline at 12.45 score.
  • Use it to rank media, single-use kit, vector, equipment, and service suppliers on one scale for audit and qualification prioritization. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Supplier risk score: 12.45 score (headline result)
  • Supplier issue impact severity: 23 score
  • Supplier issue occurrence likelihood: 5 score
  • Incoming control detectability: 6 score

Run it with your numbers

  • Every input above is editable in the live Cell Therapy Supplier Risk Score calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.