Circular Economy, Recycling & Remanufacturing worked example
Circular Design Readiness with design-for-circularity gap severity score of 20 score: a worked example
What does the result look like when design-for-circularity gap severity score reaches 20 score? The full calculation is worked below with real intermediate numbers. a team needs to prioritize design changes that improve reuse, repair, remanufacturing, or recycling for a design review
The inputs for this scenario
- Design-for-circularity gap severity score: 20 score (raised for this scenario; the documented default is 8)
- Likelihood the gap affects recovery score: 4 score (unchanged)
- Weakness of current design review controls score: 5 score (unchanged)
Working through the calculation
- Applying the documented formula (Circular Design Readiness score = design-for-circularity gap severity score × likelihood the gap affects recovery score × weakness of current design review controls score) to the inputs above produces each figure below.
- At this operating point the engine returns 10.65 score for circular design readiness score, the number this scenario is built around.
- At this operating point the engine returns 20 score for design-for-circularity gap severity score.
- At this operating point the engine returns 4 score for likelihood the gap affects recovery score.
- At this operating point the engine returns 5 score for weakness of current design review controls score.
How this compares with the baseline
- Against the tool's baseline example, where design-for-circularity gap severity score sits at 8 score and the headline result is 5.85 score, this scenario comes in 82.05% above the baseline at 10.65 score.
- A figure at this level is achievable when design-for-circularity gap severity score is genuinely sustained, not just peaked for a shift. The score is only as consistent as your scoring scale — it ranks relative risk, it does not predict an absolute recovery rate or cost, and unscaled scores from different reviewers are not comparable.
Results at a glance
- Circular Design Readiness score: 10.65 score (headline result)
- Design-for-circularity gap severity score: 20 score
- Likelihood the gap affects recovery score: 4 score
- Weakness of current design review controls score: 5 score
Run it with your numbers
- Every input above is editable in the live Circular Design Readiness calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.