Circular Economy, Recycling & Remanufacturing worked example
Closed-Loop Inventory Days with daily closed-loop consumption of 530 units / day: a worked example
This scenario runs the closed-loop inventory days calculation on the strong side: daily closed-loop consumption of 530 units / day, with every other input held at its documented default. a team needs to avoid shortages caused by slow returns, inspection holds, or variable reuse demand for a closed-loop inventory pool
The inputs for this scenario
- Daily closed-loop consumption: 530 units / day (raised for this scenario; the documented default is 210)
- Return, inspection, repair, or replenishment lead time: 9 days (unchanged)
- Closed-loop safety stock: 500 units (unchanged)
Working through the calculation
- Applying the documented formula (Loop cycle stock = daily closed-loop consumption × return, inspection, repair, or replenishment lead time) to the inputs above produces each figure below.
- At this operating point the engine returns 0.12 units for protected days of supply, the number this scenario is built around.
- At this operating point the engine returns 58.89 days for unprotected days.
- At this operating point the engine returns 530 pieces for inventory.
- At this operating point the engine returns 9 pieces / day for daily usage.
How this compares with the baseline
- Against the tool's baseline example, where daily closed-loop consumption sits at 210 units / day and the headline result is 0.05 units, this scenario comes in 152% above the baseline at 0.12 units.
- Use it when sizing a returnable-asset pool, core bank, or refurbished-unit float for a closed-loop replenishment system. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Protected days of supply: 0.12 units (headline result)
- Unprotected days: 58.89 days
- Inventory: 530 pieces
- Daily usage: 9 pieces / day
Run it with your numbers
- Every input above is editable in the live Closed-Loop Inventory Days calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.