Circular Economy, Recycling & Remanufacturing worked example
Core Recovery Rate at 49% target core recovery rate: a worked example
This worked example runs the core recovery rate numbers for a tougher week than the baseline: 49% target core recovery rate instead of the typical 68%. Calculate the share of sold or eligible products that return as usable cores for remanufacturing.
The inputs for this scenario
- Usable cores returned: 1,380 cores (held at the documented default)
- Eligible cores expected from sold units or service population: 2,100 cores (held at the documented default)
- Target core recovery rate: 49 % (the input this scenario stresses; the baseline uses 68)
Working through the calculation
- The calculation starts from the formula this tool documents: Core Recovery Rate = usable cores returned ÷ eligible cores expected from sold units or service population × 100.
- Core Recovery Rate result works out to 65.71 % at these inputs, and this is the headline figure for the scenario.
- Core Recovery Rate gap to target works out to -16.71 points at these inputs.
- Usable cores returned works out to 1,380 count at these inputs.
- Eligible cores expected from sold units or service population works out to 2,100 count at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where target core recovery rate sits at 68% and the headline result is 65.71 %, this scenario lands almost exactly on the baseline at 65.71 %.
- Use it when reviewing core program health, setting or adjusting core charges, or diagnosing why a reman line is short on cores. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Core Recovery Rate result: 65.71 % (headline result)
- Core Recovery Rate gap to target: -16.71 points
- Usable cores returned: 1,380 count
- Eligible cores expected from sold units or service population: 2,100 count
Run it with your numbers
- To rerun this with your own numbers, open the live Core Recovery Rate calculator, set target core recovery rate to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.