Circular Economy, Recycling & Remanufacturing worked example
Reman Quality Yield at 99% target reman first-pass quality yield: a worked example
This scenario runs the reman quality yield calculation on the strong side: 99% target reman first-pass quality yield, with every other input held at its documented default. a team needs to prioritize repair standard work, test escapes, and supplier core quality issues for a remanufacturing line
The inputs for this scenario
- Remanufactured units passing final quality: 910 units (unchanged)
- Remanufactured units completed and tested: 1,040 units (unchanged)
- Target reman first-pass quality yield: 99 % (raised for this scenario; the documented default is 92)
Working through the calculation
- Applying the documented formula (Reman Quality Yield = remanufactured units passing final quality ÷ remanufactured units completed and tested × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 87.5 % for reman quality yield result, the number this scenario is built around.
- At this operating point the engine returns 11.5 points for reman quality yield gap to target.
- At this operating point the engine returns 910 count for remanufactured units passing final quality.
- At this operating point the engine returns 1,040 count for remanufactured units completed and tested.
How this compares with the baseline
- Against the tool's baseline example, where target reman first-pass quality yield sits at 92% and the headline result is 87.5 %, this scenario lands almost exactly on the baseline at 87.5 %.
- Use it per build run, per product family, or per core supplier to judge how reliably your reman process produces warrantable units the first time. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Reman Quality Yield result: 87.5 % (headline result)
- Reman Quality Yield gap to target: 11.5 points
- Remanufactured units passing final quality: 910 count
- Remanufactured units completed and tested: 1,040 count
Run it with your numbers
- Every input above is editable in the live Reman Quality Yield calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.