Circular Economy, Recycling & Remanufacturing worked example
Reuse Inventory Days with daily reuse demand or withdrawals of 360 units / day: a worked example
Push daily reuse demand or withdrawals up to 360 units / day and the picture changes. This example computes every intermediate figure at that operating point. a team needs to set buffer stock for reusable assets or recovered components for a reuse stock point
The inputs for this scenario
- Daily reuse demand or withdrawals: 360 units / day (raised for this scenario; the documented default is 145)
- Reuse loop replenishment lead time: 12 days (unchanged)
- Safety stock for return variability and quality holds: 420 units (unchanged)
Working through the calculation
- Applying the documented formula (Loop cycle stock = daily reuse demand or withdrawals × reuse loop replenishment lead time) to the inputs above produces each figure below.
- At this operating point the engine returns 0.07 units for protected days of supply, the number this scenario is built around.
- At this operating point the engine returns 30 days for unprotected days.
- At this operating point the engine returns 360 pieces for inventory.
- At this operating point the engine returns 12 pieces / day for daily usage.
How this compares with the baseline
- Against the tool's baseline example, where daily reuse demand or withdrawals sits at 145 units / day and the headline result is 0.03 units, this scenario comes in 148% above the baseline at 0.07 units.
- It computes required loop inventory as cycle stock — daily reuse demand times replenishment lead time — plus a safety stock for return variability and quality holds. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Protected days of supply: 0.07 units (headline result)
- Unprotected days: 30 days
- Inventory: 360 pieces
- Daily usage: 12 pieces / day
Run it with your numbers
- Every input above is editable in the live Reuse Inventory Days calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.