Clinical, Diagnostics & Lab Consumables Manufacturing worked example
Lot Release Sample Load at 23% aql pull, quarantine, lims, review, and retest allowance: a worked example
This worked example runs the lot release sample load numbers for a tougher week than the baseline: 23% aql pull, quarantine, lims, review, and retest allowance instead of the typical 32%. Estimate QC and QA time required to pull, inspect, test, document, and disposition lot-release samples for clinical consumables or diagnostic kits.
The inputs for this scenario
- Lot-release and retained samples to process: 360 samples (held at the documented default)
- Sample handling and test documentation rate: 1.1 samples / min (held at the documented default)
- AQL pull, quarantine, LIMS, review, and retest allowance: 23 % (the input this scenario stresses; the baseline uses 32)
Working through the calculation
- The calculation starts from the formula this tool documents: Base lot release sample load time = lot-release samples and retained samples รท sample handling and test documentation rate.
- Required lot release sample load time works out to 403 min at these inputs, and this is the headline figure for the scenario.
- Base lot release sample load time works out to 327 min at these inputs.
- AQL pull, quarantine movement, LIMS entry, review, and retest allowance applied works out to 23 % at these inputs.
- Sample handling and test documentation rate works out to 1.1 pieces / min at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where aql pull, quarantine, lims, review, and retest allowance sits at 32% and the headline result is 432 min, this scenario comes in 6.82% below the baseline at 403 min.
- Use it when sizing the QC release bench for a production run, scheduling lot disposition, or quoting lead time from line-off to shippable. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Required lot release sample load time: 403 min (headline result)
- Base lot release sample load time: 327 min
- AQL pull, quarantine movement, LIMS entry, review, and retest allowance applied: 23 %
- Sample handling and test documentation rate: 1.1 pieces / min