Coffee, Tea, Roasting & Dry Goods Processing worked example
Packaging Line Output at 94% packaging line efficiency: a worked example
This scenario runs the packaging line output calculation on the strong side: 94% packaging line efficiency, with every other input held at its documented default. scheduling bagging, cartoning, case packing, or dry goods packaging lines
The inputs for this scenario
- Saleable bags packaged: 9,600 bags (unchanged)
- Packaging line runtime: 8 hr (unchanged)
- Packaging line efficiency: 94 % (raised for this scenario; the documented default is 82)
Working through the calculation
- Applying the documented formula (Raw packaging line output = saleable packages completed รท packaging runtime) to the inputs above produces each figure below.
- At this operating point the engine returns 1,128 bags / hr for effective packaging line output, the number this scenario is built around.
- At this operating point the engine returns 1,200 bags / hr for raw packaging line output.
- At this operating point the engine returns 94 % for packaging line efficiency.
- At this operating point the engine returns 8 hr for packaging runtime.
How this compares with the baseline
- Against the tool's baseline example, where packaging line efficiency sits at 82% and the headline result is 984 bags / hr, this scenario comes in 14.63% above the baseline at 1,128 bags / hr.
- Use it when scheduling packaging runs, committing to an order ship date, or sizing the line against upstream grind and roast volume. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- effective packaging line output: 1,128 bags / hr (headline result)
- raw packaging line output: 1,200 bags / hr
- packaging line efficiency: 94 %
- packaging runtime: 8 hr
Run it with your numbers
- Every input above is editable in the live Packaging Line Output calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.