Commercial Vehicle, Bus & Coach Manufacturing worked example

Parts Kitting Labor at 72% kitting scope included: a worked example in commercial vehicle, bus & coach manufacturing

Here is what the math looks like when conditions slip. We hold every other input steady and drop kitting scope included to 72%, then walk the calculation through step by step. Estimate labor cost to kit parts for commercial vehicle, bus, or coach assembly.

The inputs for this scenario

  • Vehicle assembly kits prepared: 260 units (held at the documented default)
  • Kitting labor cost per kit: 18 $ / unit (held at the documented default)
  • Kitting scope included: 72 % (the input this scenario stresses; the baseline uses 100)
  • Kitting setup, cart, and replenishment cost: 750 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Variable parts kitting labor = vehicle assembly kits prepared × kitting labor cost per kit × kitting scope included.
  • total parts kitting labor works out to 4,120 $ at these inputs, and this is the headline figure for the scenario.
  • parts kitting labor per vehicle works out to 15.84 $ / piece at these inputs.
  • variable parts kitting labor works out to 3,370 $ at these inputs.
  • kitting setup, cart, and replenishment cost works out to 750 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where kitting scope included sits at 100% and the headline result is 5,430 $, this scenario comes in 24.13% below the baseline at 4,120 $.
  • The practical read: the gap between this scenario and the baseline is entirely attributable to kitting scope included, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. It assumes a flat labor cost per kit; in reality kit complexity varies widely between a dash harness kit and a wheel-well fastener kit, so blend your rates or run high-mix kits separately.

Results at a glance

  • total parts kitting labor: 4,120 $ (headline result)
  • parts kitting labor per vehicle: 15.84 $ / piece
  • variable parts kitting labor: 3,370 $
  • kitting setup, cart, and replenishment cost: 750 $

Run it with your numbers

  • To rerun this with your own numbers, open the live Parts Kitting Labor calculator, set kitting scope included to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.