Composites, Fiberglass & Advanced Materials worked example
Laminate Thickness at 66% layup station uptime: a worked example
This worked example runs the laminate thickness numbers for a tougher week than the baseline: 66% layup station uptime instead of the typical 92%. Estimate good laminate thickness output capability for plies, cores, or panel builds.
The inputs for this scenario
- Laminate thickness added per build cycle: 0.13 in / cycle (held at the documented default)
- Planned laminate build cycles: 48 cycles (held at the documented default)
- Layup station uptime: 66 % (the input this scenario stresses; the baseline uses 92)
- Laminate first-pass yield: 96 % (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Gross laminate thickness = laminate thickness added per build cycle × planned laminate build cycles.
- good laminate thickness works out to 3.8 in at these inputs, and this is the headline figure for the scenario.
- gross laminate thickness works out to 6 in at these inputs.
- laminate thickness lost to downtime works out to 2.04 in at these inputs.
- laminate thickness lost to scrap or rework works out to 0.16 in at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where layup station uptime sits at 92% and the headline result is 5.3 in, this scenario comes in 28.26% below the baseline at 3.8 in.
- Use it during layup planning or capacity reviews when you need to know whether a planned number of plies or build cycles will deliver the required cured thickness after real-world losses. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- good laminate thickness: 3.8 in (headline result)
- gross laminate thickness: 6 in
- laminate thickness lost to downtime: 2.04 in
- laminate thickness lost to scrap or rework: 0.16 in
Run it with your numbers
- To rerun this with your own numbers, open the live Laminate Thickness calculator, set layup station uptime to your actual value, and adjust the remaining inputs to match your operation.