Composites, Fiberglass & Advanced Materials worked example

Prepreg Out Time Risk with out-time defect severity rating of 20 score: a worked example

Push out-time defect severity rating up to 20 score and the picture changes. This example computes every intermediate figure at that operating point. prioritizing controls for prepreg out-time exposure

The inputs for this scenario

  • Out-time defect severity rating: 20 score (raised for this scenario; the documented default is 8)
  • Out-time exposure occurrence rating: 3 score (unchanged)
  • Out-time detection difficulty rating: 5 score (unchanged)

Working through the calculation

  • Applying the documented formula (Prepreg Out Time Risk = out-time severity score × out-time occurrence score × out-time detection difficulty score) to the inputs above produces each figure below.
  • At this operating point the engine returns 10.3 score for prepreg out time risk score, the number this scenario is built around.
  • At this operating point the engine returns 20 score for out-time severity score.
  • At this operating point the engine returns 3 score for out-time occurrence score.
  • At this operating point the engine returns 5 score for out-time detection difficulty score.

How this compares with the baseline

  • Against the tool's baseline example, where out-time defect severity rating sits at 8 score and the headline result is 5.5 score, this scenario comes in 87.27% above the baseline at 10.3 score.
  • It multiplies the severity, occurrence and detection ratings for prepreg out-time into a single FMEA-style risk priority score. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Prepreg out time risk score: 10.3 score (headline result)
  • out-time severity score: 20 score
  • out-time occurrence score: 3 score
  • out-time detection difficulty score: 5 score

Run it with your numbers

  • Every input above is editable in the live Prepreg Out Time Risk calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.