Appliances, HVAC & White Goods Manufacturing calculator
Compressor Test Yield Calculator Calculator
Compressor test yield measures how many compressors pass pressure, electrical, noise, vibration, oil, capacity, or run tests without rework or hold. This calculator compares passed compressors with tested compressors and shows the gap to the target.
What this calculator does
- Calculate compressor test yield from compressors passed, compressors tested, and target test yield.
- a compressor test or quality engineer needs to track first-pass compressor test performance
- Shows first-pass compressor test yield and target gap.
Formula used
- Compressor test yield = compressors passed test ÷ total compressors tested × 100
- Compressor yield gap to target = compressor test yield - target compressor test yield
Inputs explained
- Compressors passed test: undefined
- Total compressors tested: undefined
- Target compressor test yield: undefined
How to use the result
- Use it for compressor assembly, supplier incoming checks, refrigeration module testing, or final sealed-system quality reviews.
- Yield depends on test limits, fixtures, oil charge, electrical conditions, noise criteria, leak status, retest policy, and supplier lot quality.
Common questions
- What counts as passed? Count compressors that pass the defined test sequence without rework, retest, or quality override.
- Should no-fault-found retests count as failures? For first-pass yield, yes; for final yield, follow your site metric consistently.
- What does the gap show? It shows whether test yield is above or below the target by percentage points.
- How can I use the result? Use it to trigger supplier action, fixture review, process improvement, or capacity planning for retest.
Last reviewed 2026-05-12.