Configure-to-Order & Product Configuration worked example
Configuration Error Cost at 110% share of error cost captured: a worked example
This scenario runs the configuration error cost calculation on the strong side: 110% share of error cost captured, with every other input held at its documented default. prioritizing configuration error reduction projects
The inputs for this scenario
- Configuration errors requiring correction: 24 errors (unchanged)
- Average cost per configuration error: 740 $ / error (unchanged)
- Share of error cost captured: 110 % (raised for this scenario; the documented default is 100)
- Fixed containment and rule-fix cost: 2,100 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable configuration error cost = configuration errors requiring correction × average cost per configuration error × error cost scope included) to the inputs above produces each figure below.
- At this operating point the engine returns 21,636 $ for total configuration error cost, the number this scenario is built around.
- At this operating point the engine returns 902 $ / piece for configuration error cost per configured unit or quote.
- At this operating point the engine returns 19,536 $ for variable configuration error cost.
- At this operating point the engine returns 2,100 $ for fixed containment and rule-fix cost.
How this compares with the baseline
- Against the tool's baseline example, where share of error cost captured sits at 100% and the headline result is 19,860 $, this scenario comes in 8.94% above the baseline at 21,636 $.
- Use it after a quality review, a CTO escape, or when building the business case for configurator validation improvements. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- total configuration error cost: 21,636 $ (headline result)
- configuration error cost per configured unit or quote: 902 $ / piece
- variable configuration error cost: 19,536 $
- fixed containment and rule-fix cost: 2,100 $
Run it with your numbers
- Every input above is editable in the live Configuration Error Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.