Configure-to-Order & Product Configuration worked example
CTO Schedule Impact at 110% share of impact scope included: a worked example
What does the result look like when share of impact scope included reaches 110%? The full calculation is worked below with real intermediate numbers. evaluating the cost of configuration-driven schedule disruption
The inputs for this scenario
- Configuration-driven delay events on the job: 18 events (unchanged)
- Schedule impact cost per delay event: 1,250 $ / event (unchanged)
- Share of impact scope included: 110 % (raised for this scenario; the documented default is 100)
- Fixed recovery and communication cost: 1,600 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable cto schedule impact = configuration-driven delay events × schedule impact cost per event × schedule impact scope included) to the inputs above produces each figure below.
- At this operating point the engine returns 26,350 $ for total cto schedule impact, the number this scenario is built around.
- At this operating point the engine returns 1,464 $ / piece for cto schedule impact per configured unit or quote.
- At this operating point the engine returns 24,750 $ for variable cto schedule impact.
- At this operating point the engine returns 1,600 $ for fixed recovery and communication cost.
How this compares with the baseline
- Against the tool's baseline example, where share of impact scope included sits at 100% and the headline result is 24,100 $, this scenario comes in 9.34% above the baseline at 26,350 $.
- A figure at this level is achievable when share of impact scope included is genuinely sustained, not just peaked for a shift. Cost-per-event is an estimate of downstream impact; if it omits second-order effects like lost future orders, the total understates true damage.
Results at a glance
- total cto schedule impact: 26,350 $ (headline result)
- cto schedule impact per configured unit or quote: 1,464 $ / piece
- variable cto schedule impact: 24,750 $
- fixed recovery and communication cost: 1,600 $
Run it with your numbers
- Every input above is editable in the live CTO Schedule Impact calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.