Configure-to-Order & Product Configuration worked example
Option Attach Rate at 35% target option attach rate: a worked example
Push target option attach rate up to 35% and the picture changes. This example computes every intermediate figure at that operating point. tracking option adoption and demand signals
The inputs for this scenario
- Configured orders that selected this option: 138 orders (unchanged)
- Eligible configured orders in the period: 520 orders (unchanged)
- Target option attach rate: 35 % (raised for this scenario; the documented default is 30)
Working through the calculation
- Applying the documented formula (Option Attach Rate = configured orders with the option selected ÷ eligible configured orders × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 26.54 % for option attach rate, the number this scenario is built around.
- At this operating point the engine returns 8.46 points for option attach rate gap to target.
- At this operating point the engine returns 138 count for configured orders with the option selected.
- At this operating point the engine returns 520 count for eligible configured orders.
How this compares with the baseline
- Against the tool's baseline example, where target option attach rate sits at 30% and the headline result is 26.54 %, this scenario lands almost exactly on the baseline at 26.54 %.
- It computes the percentage of eligible configured orders that selected a given option and the point gap to your target attach rate. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- option attach rate: 26.54 % (headline result)
- option attach rate gap to target: 8.46 points
- configured orders with the option selected: 138 count
- eligible configured orders: 520 count
Run it with your numbers
- Every input above is editable in the live Option Attach Rate calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.