Construction Products, Windows, Doors & Fenestration worked example
Siding Extrusion Capacity at 99% siding extrusion uptime: a worked example
What does the result look like when siding extrusion uptime reaches 99%? The full calculation is worked below with real intermediate numbers. checking whether siding extrusion can meet order demand
The inputs for this scenario
- Siding extrusion output per cycle: 360 linear ft / cycle (unchanged)
- Planned siding extrusion cycles: 24 cycles (unchanged)
- Siding extrusion uptime: 99 % (raised for this scenario; the documented default is 86)
- Siding first-pass yield: 95 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross siding extrusion capacity = siding extrusion output per cycle × planned siding extrusion cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 8,126 linear ft for good siding extrusion capacity, the number this scenario is built around.
- At this operating point the engine returns 8,640 linear ft for gross siding extrusion capacity.
- At this operating point the engine returns 86.4 linear ft for siding extrusion lost to downtime.
- At this operating point the engine returns 428 linear ft for siding extrusion lost to defects.
How this compares with the baseline
- Against the tool's baseline example, where siding extrusion uptime sits at 86% and the headline result is 7,059 linear ft, this scenario comes in 15.12% above the baseline at 8,126 linear ft.
- A figure at this level is achievable when siding extrusion uptime is genuinely sustained, not just peaked for a shift. It assumes a stable die and consistent melt; startup scrap and color-change purge can spike yield losses beyond the steady-state percentage you enter.
Results at a glance
- good siding extrusion capacity: 8,126 linear ft (headline result)
- gross siding extrusion capacity: 8,640 linear ft
- siding extrusion lost to downtime: 86.4 linear ft
- siding extrusion lost to defects: 428 linear ft
Run it with your numbers
- Every input above is editable in the live Siding Extrusion Capacity calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.