Contract Manufacturing, Job Shop Quoting & Make-to-Order worked example
Custom Part Cost at 110% costed quote scope included: a worked example
What does the result look like when costed quote scope included reaches 110%? The full calculation is worked below with real intermediate numbers. building a quote from material, routing, setup, tooling, inspection, and outside service assumptions
The inputs for this scenario
- Quoted part order quantity: 650 parts (unchanged)
- Variable cost per custom part: 24.6 $ / part (unchanged)
- Costed quote scope included: 110 % (raised for this scenario; the documented default is 100)
- Fixed setup, tooling, and engineering cost: 3,900 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable custom part cost = quoted part order quantity × variable cost per custom part × costed quote scope included) to the inputs above produces each figure below.
- At this operating point the engine returns 21,489 $ for total custom part cost, the number this scenario is built around.
- At this operating point the engine returns 33.06 $ / piece for variable cost per custom part.
- At this operating point the engine returns 17,589 $ for variable custom part cost.
- At this operating point the engine returns 3,900 $ for fixed setup, tooling, and engineering cost.
How this compares with the baseline
- Against the tool's baseline example, where costed quote scope included sits at 100% and the headline result is 19,890 $, this scenario comes in 8.04% above the baseline at 21,489 $.
- A figure at this level is achievable when costed quote scope included is genuinely sustained, not just peaked for a shift. It treats variable cost per part as flat across the quantity; if your material or cycle cost steps down with volume, costed scope below 100%, or partial tooling reuse, you must adjust the inputs to reflect that.
Results at a glance
- total custom part cost: 21,489 $ (headline result)
- variable cost per custom part: 33.06 $ / piece
- variable custom part cost: 17,589 $
- fixed setup, tooling, and engineering cost: 3,900 $
Run it with your numbers
- Every input above is editable in the live Custom Part Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.